Please update your Flash Player


Powerbar Plus Installation

Most Powerbars install in about 20 minutes. There are a few key things to watch for:
1. Always disconnect the negative battery first to prevent sparking while working with the positive battery post.
2. Slide the lower half of the Powerbar bracket over the wire first, then plug the white T connector onto the back of the socket.
3. Install the correct rubber sleeve to protect the handlebar.
4. Remember to plug in the fuse.


Video Using A Side Panel Power Outlet

Video Using A Handlebar Power Outlet

Video Wired For Life


Video Three Metric Cruiser Outlets


Video Heated Liners


Video Powerbar Plus Installation

Video PowerMount Installation

Video PKT-101 Installation

Video Sport-Touring Front Panel Kit Installation

Video Metric Cruiser Side Panel Installation